PASAR SURVEY RETAINER TEAM 

FILGEO mobilized a survey retainer team for PASAR (Philippine Associated Smelting and Refining) Corporation’s Upgrade and Replacement Project in LIDE, Isabel, Leyte. The team provided commendable surveying services such as establishment of horizontal and vertical controls, stake-out, setting elevation for excavation, elevation check, as-built, plumbness (verticality) check and alignment, as-built for angle verification, detailed topographic survey for drainage and offered other surveying support that met and exceeded client’s expectations. FILGEO was involved throughout the whole construction process from setting-out, excavation, placement and removal of forms, concrete pouring, verification through as-built and verticality check for quality control and quality assurance. In addition, FILGEO serviced PASAR multiple aerial survey projects for different portions of the plant site.   